Sewer Lines Only works with three types of contractors on projects across the Denver metro. Each has a different scope requirement, but the underlying problem is the same: underground plumbing work that needs a specialist with locating equipment, excavation capability, and permit familiarity.

ADU Contractors

ADU builds in Denver run into underground utility surprises more often than any other residential project type. City maps are frequently wrong about where laterals run, what size the existing water service is, and whether the sewer has the capacity for an additional dwelling unit. Finding that out after the foundation is in costs far more than finding it out at the start.

We provide utility discovery and field verification before the foundation is designed, SUDP submission support through DOTI, and full underground installation from sewer tap to water service connection. ADU contractors who work with us once tend to put us on every subsequent project because we eliminate the sub-coordination problem entirely.

General Contractors

General contractors on renovation and new build projects need an underground plumbing sub who shows up, works to a schedule, and does not create problems for the framing and concrete crews. The coordination cost of a plumbing sub who runs behind, misses inspections, or leaves the site without completing the connection is high.

We coordinate directly with GC project managers, keep to the sequencing timeline, communicate site status the same day something changes, and complete underground and rough-in work so the next trade can follow on schedule. We do not subcontract the underground scope to another crew.

Commercial Contractors

Commercial renovation and new construction projects require underground plumbing subs with permitting experience, equipment capable of working at commercial scale, and crews that understand how to sequence work around occupied spaces and business operations.

Sewer Lines Only handles commercial sewer installation, water service installation, storm drain connections, underground utility discovery, and trenchless solutions for commercial builds where surface disruption needs to be minimized. We work directly with commercial GC project managers and keep the city coordination in-house rather than pushing it back to the contractor.

What Sewer Lines Only Handles on Contractor Projects

1. Utility Discovery and Site Evaluation

Before any excavation, design, or permit submission, you need to know what is actually in the ground. City maps and architectural plans frequently show sewer lateral routing, depth, and condition that does not match what the camera finds. Water service size and pressure documented on city records often differs from field measurements.

We provide field-verified utility data: sewer line locating and scoping (routing, depth, condition, size), water service evaluation (pressure, size, current condition, and whether upsizing is required), gas service review, and identification of conflicts with footers, utilities, and site layout.

This step costs a fraction of the rework that happens when a foundation design conflicts with an undiscovered utility. On ADU projects specifically, skipping the site evaluation is the most common reason for mid-project delays and budget overruns.

2. SUDP and Permit Support

Denver’s Sewer Use and Drainage Permit (SUDP) process is managed by DOTI and is required for any project that adds or modifies sewer or drainage connections to the municipal system. ADU builds require a SUDP for each structure. The application goes through Denver’s E-Permits system and must be submitted by the property owner’s authorized agent.

SUDP review checks sanitary sewer capacity, storm drainage compliance, and quality control device requirements. If DOTI reviewers come back with correction comments, the project timeline slides until the response is submitted and re-reviewed. Getting the submission right the first time keeps the project on schedule.

We help contractors understand required upgrades before the foundation is poured, prepare accurate SUDP documents for the GC or property owner to submit, communicate with city reviewers on technical questions, and prevent the rework that comes from non-compliant or outdated existing lines that were not assessed before submission.

3. Underground Utility Installation

Once the site is evaluated and permits are approved, we handle the full underground installation scope. That includes:

  • Sewer line installation, replacement, and rerouting for new ADU connections and commercial builds
  • Water service installation and upsizing where the existing service cannot support additional demand
  • Storm drain connections for drainage compliance under SUDP review
  • Gas line installation and trenching coordinated with the GC sequencing schedule

Our excavation team, plumbers, and project managers work as one crew. Contractors do not manage the handoff between an excavator and a plumber. That coordination is our problem.

4. Trenchless Solutions Where Site Conditions Allow

On projects where surface disruption matters, such as alley-adjacent ADUs in established neighborhoods, commercial sites with active parking areas, or renovations on occupied properties, trenchless sewer repair reduces the footprint of underground work significantly. CIPP lining rehabilitates existing pipe from inside. Pipe bursting replaces the old pipe while pulling a new one through the same path.

We assess trenchless viability as part of the site evaluation and recommend it where the pipe condition and access support it. We do not default to open excavation when a no-dig option exists, and we do not default to trenchless when the pipe condition requires direct access.

5. Full Rough-In to Finish Plumbing

For ADU projects and commercial builds that need a single plumbing partner from underground to finish, we provide the complete scope:

  • Rough-ins for bathrooms, kitchens, and laundry
  • Venting, drains, water lines, and fixture connections
  • Water heater installation and shutoff systems
  • Final inspections and city walkthrough coordination

One partner responsible for everything underground and above means no gaps and no handoff disputes when an inspection fails.

ADU Plumbing in Denver: What the Permit Process Actually Requires

Denver’s ADU program has grown considerably since the city expanded zoning permissions for accessory structures. That growth has created a large pool of GCs who are building ADUs for the first time and running into the utility process without a reliable sub who knows it.

Here is what the underground plumbing process on a Denver ADU actually involves:

Step What Happens and Who Handles It
Site evaluation Field verification of sewer lateral routing, depth, condition, and capacity. Water service size and pressure check. Conflict identification with proposed foundation and site layout. SLO performs this before any design work is finalized.
Denver Water consultation System Development Charges (SDCs) apply to new ADU connections. Meter size and demand determine fees. Existing service size dictates whether upsizing is required. SLO evaluates current service capacity and flags upsizing requirements before the application.
SUDP (DOTI) Required for every ADU structure. Must be submitted through Denver E-Permits by the property owner’s authorized agent or GC — SLO cannot submit on their behalf. Covers sanitary sewer, storm drainage, and quality control devices. SLO prepares accurate documents, advises on submission, and responds to review comments.
Underground installation Sewer connection, water service, storm drain, and gas line work after permit approval. SLO handles excavation, installation, inspection coordination, and site restoration.
Rough-in and finish For projects where SLO handles the complete plumbing scope: bathrooms, kitchen, laundry, fixtures, water heater, final inspections.

The projects that stay on schedule are the ones that complete site evaluation and SUDP submission before the foundation design is final. Changes to the sewer lateral routing or water service configuration after the foundation is in are expensive. We push for early engagement on every ADU project for that reason.

How We Work With Contractor Project Managers

Contractors need subcontractors who reduce coordination overhead, not add to it. Here is how we structure the working relationship.

  • One crew, no handoffs. Our excavation teams, plumbers, and project managers are all direct employees. We own the equipment. There is no excavation sub and plumbing sub to coordinate between. When you call us, one company handles the full underground scope.
  • Project manager communication, not dispatcher relay. We communicate directly with GC project managers, not through a call center. When something changes on site, you hear from the person who is running the job.
  • Sequencing-aware scheduling. We know where we fit in the construction sequence and schedule our work around the framing and concrete crews, not the other way around.
  • City coordination in-house. We manage SUDP submissions, respond to city review comments, schedule inspections, and handle the permit communication so that work does not land back on the GC’s plate.
  • Free estimates and second opinions. If you have a quote from another sub that looks wrong, we will review it. If you are scoping a project and need a number before committing to the owner, we provide estimates at no charge.
  • Complimentary post-repair and post-installation camera video. Every completed underground installation includes camera footage showing the finished work. That documentation protects the contractor when the owner or inspector has questions after the fact.

Underground Plumbing Services for Contractor Projects

  • All of the services below are available as a standalone scope or as part of a complete underground-to-finish engagement depending on what the project requires.
    • Sewer line installation and rerouting for ADU connections and commercial new builds
    • Sewer line repair for existing laterals that fail inspection or camera review prior to project start
    • Sewer line replacement where the existing lateral cannot meet current code or capacity requirements
    • Trenchless sewer repair (CIPP lining, pipe bursting) where no-dig methods reduce surface disruption
    • Underground sewer repair for deep or buried line failures that require excavation
    • Commercial water line repair and installation including upsizing for increased demand from new construction
    • Storm sewer connections for drainage compliance and SUDP review requirements
    • Sewer line cleaning of existing laterals before SUDP submission or project start to establish baseline condition

Why Contractors Choose Sewer Lines Only

  • Specialization in underground sewer and water work. We do not dilute across every plumbing category. Excavation, sewer, and water line work is what we do. That depth shows in how our crews handle permit issues, unusual field conditions, and inspection coordination.
  • Owned equipment and direct employee crews. No subcontracting on underground work. One accountable company from site evaluation to final inspection.
  • ADU permit process experience. We have processed SUDP applications in Denver across a wide range of property conditions. That experience prevents the correction comments and re-submission cycles that push ADU timelines.
  • 5-year transferable warranty on all sewer line repairs and replacements.
  • 900 plus five-star reviews across residential and commercial clients, including contractor referrals.
  • No upselling. We scope what is needed, present options with written pricing, and let the contractor and owner decide. We do not recommend underground replacement when a repair or cleaning is the right call.

Frequently Asked Questions

SUDP stands for Sewer Use and Drainage Permit, administered by Denver’s Department of Transportation and Infrastructure (DOTI). Every ADU in Denver requires a separate SUDP for each structure, regardless of whether the existing sewer connection is being modified. The permit review covers sanitary sewer capacity, storm drainage compliance, and quality control device requirements. It is submitted through Denver’s E-Permits system and must clear DOTI review before foundation work begins. Projects that skip SUDP verification before finalizing the foundation design frequently encounter expensive surprises when the existing lateral does not meet current standards.

Before the foundation design is final. The site evaluation and utility discovery step needs to happen before the structural design is locked because the sewer lateral routing, depth, and condition directly affect where the foundation can go and how the utilities connect. Engaging after foundation design increases the chance of conflicts that require design changes or expensive rerouting.

We assist with SUDP documentation and support the submission process. The actual SUDP application must be submitted by the property owner’s authorized agent per DOTI requirements. We prepare accurate documents and advise the GC or property owner’s agent on submission — the actual application must go through them. We respond to review comments and coordinate with city reviewers so the process moves without unnecessary delays.

That is exactly the situation the site evaluation is designed to surface before construction starts rather than after. When we find an existing lateral that is undersized, deteriorated, or routed differently than the city map shows, we document it with camera footage and field measurements, explain what standard the current condition fails to meet, and present the repair or replacement options with written pricing. The contractor and owner then have the information to make the right decision before it becomes a construction crisis.

Yes, for ADU projects and smaller commercial builds. We provide the full scope from utility discovery through rough-in plumbing, water heater installation, fixture connections, and final inspection coordination. Larger commercial projects may involve scoping the underground and rough-in together with the GC to determine where it makes sense to split the responsibility.

Trenchless methods apply primarily to existing pipe rehabilitation rather than new installation. On ADU projects where the existing lateral needs to be lined or replaced using a no-dig method before the new connection is made, we use CIPP lining or pipe bursting. New sewer connections for ADUs typically require a tap into the existing main, which involves open excavation at the connection point regardless of what method is used for the lateral run.

Every completed underground job includes a complimentary post-installation camera video showing the finished work, written scope-of-work documentation, and inspection records. On trenchless projects, we provide before and after camera footage. These records protect the contractor when the owner, inspector, or future buyer asks for documentation of underground utility work.